Construction of New Op & Casualty Block at KMCH Ettumanoor

Construction of New Op & Casualty Block at KMCH Ettumanoor, A National Health Mission Project. 

Foundation stone laid by  Sri. V N Vasavan on 13.09.2022   

The works for the project with INKEL Ltd. as the PMC  commenced on 29.09.2022. Construction duration is 12 months.