/

Under Construction

Major Projects under construction
Area- 26649 Sqm
Floors- LG2+LG1+G+7+ terrace (10 floors)
No of Beds- 391 beds (288 ward+63 ICU+34 isolation/Payward+6 Nicu)
No of OT- 10nos
  • Area- 15,695 Sqm
  • Floors- LG+G+4+ terrace (6 floors)
  • No of Beds- 110
  • No of OT- 4 Nos + 1 No. Casualty OT

Features & Facilities

  • Plot Area 12.12 Acre
  • Area 6.36 lakhs Sq.ft.
  • No. of Beds 420
  • No. of floors 9 floors (LG3 + LG2+LG1+G+5)
  • Radiation Therapy (LINAC, Brachy therapy, CT stimulator)
  • Nuclear Medicine
  • Radio diagnosis
  • 12 Operation Theaters
  • Pain & Palliative Unit
  • Beds 420 incl. ICUs, chemo & ward beds

Features & Facilities:

  • Built up Area 8.27 LAKHS Sq.ft
  • No. of Floors: 8 (3 Basement + GF + 4 Floors)
  • Casualty, Dialysis, Pharmacy & store, Clinical Lab, Kitchen etc.
  • 12 no. of OPs
  • 112 ICU Beds
  • 571 Ward Beds (for each dept like gynaec, paediatrics, general surgery, general medicine etc)
  • 14 no. of Operation Theatres
  • Trauma Facilities incl. no. of beds, OT etc.
  • And other facilities CSSD; 550 KLD STP

  • Contract Value: Rs. 88.97 Cr
  • Built-up area: 2,53,441 SQ FT BLDG,
  • G+6 Floors
  • 8 OTs, 312 beds, 31 OPDs

Transport Department of Kerala Government assigned INKEL for construction of KSRTC bus terminal complex at Alappuzha, Temporary garage and passenger terminal at Kalavoor. The total cost for the project is estimated to be Rs 493.06 Cr as per the Administrative Sanction issued by the Department. 

  • 2.25MWp Grid Connected Ground Mount Solar Power Plant for KSEBL in Brahmapuram, Ernakulam
  • 2MWp Grid Connected Ground Mount Solar Power Plant for Autokast Limited in Cherthala, Alappuzha
  • 1.25MWp Grid Connected Ground Mount Solar Power Plant for KSEBL in Kanjikode, Palakkad
  • 6kWp Floating Solar Power Plant in Wayanad
  • Hybrid Rooftop Solar Power Plants for RDPR in Karnataka
  • Total area: 1.1 lakh sqft
  • LG+ G+ 5 floors
  • 7 OTs
  • 125 beds